Goulbourn Recreational Complex – Pool Rehabilitation

  • Date:June 2015
  • Location:1500 Shea Road, Ottawa
  • Project Type:Rehabilitation
  • Cost:$4.1million
  • Client Name:City of Ottawa
  • Client Website:Visit Website

Project involved interior and exterior work to the existing pool building. Sensitive structural roof removals, new metal deck, and large span girder ties were added for new seismic structure requirements. Removal of the floor slabs and masonry walls to accommodate reinforced grade beams below, slab between the columns also contributed to seismic upgrade requirements.

The pool area is being 100% refurbished with new aluminum framing and glazing, composite metal panels, and metal siding. The interior work involved new mechanical and electrical, sprinklers, large areas of ceramic upgrades, paint and lighting. This is a fast-track city project for quick turnaround.