Dow’s Lake Pump House & Tunnel

  • Date:August 2013
  • Location:Dow's Lake - Ottawa
  • Project Type:Upgrade
  • Cost:$1.53 million
  • Client Name:City of Ottawa

Perform structural repairs to interior of existing tunnel. Pressure grout injection of main joint to stop substantial water infiltration. Full removal of existing rail lighting, upgrading to high visibility fixtures. Heavy grade heat tracing cable
systems ($900,000.00) used in the tunnel protection. Exacting precise scheduling with the O-Train, OC Transpo, and the City of Ottawa personnel resulted in the successful completion on time, on budget.